Services

INSTALLATION GUIDELINES

INSTALLATION GUIDELINES

It is essential that the compressor is installed properly. This will improve the reliability of your compressor, prevent breakdown, and ensure high uptime. Deep Pneumatics Installation & Maintenance Guidelines is a quick guide on how to design your compressor room or workplace. This helps you to prepare for the installation of a compressor even before the unit has arrived at your site. The unit is ready to be installed and commissioned the moment it arrives at your site. No modifications will be required as you would have already taken into consideration all factors while designing the compressor workplace.

Please go through the guideline before designing a compressor room or installing our compressor. In case you need any further assistance please contact our nearest dealer you may contact on our customer care No. +91-79-22803684.

GUIDELINES FOR FASTER AND EFFECTIVE INSTALLATION

GUIDELINES FOR FASTER AND EFFECTIVE INSTALLATION

Check Compressor is Kept on leveled Floor
Check Compressor is Kept on leveled Floor
Check Availability of Correct Grade and Quantity of Lubricating Oil
Check Availability of Recommended Cables & Isolators
Check for the Correct Ventilation
Check Availability of Water Flow and Recommended Water Inlet
Check for the Correct Layout for the Air and Water Piping
Check Tightness for Cable Connections and Panel Wiring
Check any Loose Parts Before Starting the Compressor
Check Power Input for Voltage and Capacity
Check Correct Installation of Dryer, Filter and Receiver
Check Compressor Direction of Rotation
GUIDELINES FOR COMMISSIONING/INSTALLATION OF INDUSTRIAL AIR COMPRESSORS

GUIDELINES FOR COMMISSIONING/INSTALLATION OF INDUSTRIAL AIR COMPRESSORS

Compressor should be Installed / Placed in a Well Ventilated / Cross-Ventilated Room
Compressor must be placed on a leveled Concrete Floor
Compressor should be Placed at a Minimum Distance of 1 to 1.2 Meter away from the Wall or from any Stationary Equipment (Free from all the Sides)
Compressor Room Temperature Rise should not be More than 5 Degree above Ambient. Ducting of Hot Air from the Compressor to the Outside Room is Mandatory (Please Refer the Instruction Book)
Isolator / MCB / SFU or Suitable Capacity must be Provided by the Customer to the In-coming Supply Near the Compressor
The Residual Voltage should not exceed more than 1 volt between neutral to earth.
In-coming Voltage should be 415+/- 5% (max).
Check the Electrical Connections for Fightness. The Installation must be Protected Against the Short Circuits Fuses of Inserted Type in All Phases
RECOMMENDED INCOMING CABLE SIZE & OVER LOAD SETTING

RECOMMENDED INCOMING CABLE SIZE & OVER LOAD SETTING

MOTOR RATING INCOMING CABLE MAX. SETTING MAX. FUSE RATINGS
Size in Sq.mm, 3.5 Core Over Load Relay
in HP CU AL in AMPS
15 6 10 16 32
20 10 16 21 50
25 16 25 25 63
30 16 25 29 63
40 25 35 39 80
50 35 50 46 100
60 60 70 56 100
75 50 95 61 160
100 70 150 84 160
120 95 185 110 200
150 150 240 134 250
180 185 400 161 315
215 240 325 or 150,
(2 Run)
191 400